Network Installation, Configuration and Testing
Friday, 01 December 2006 07:57

For indoor wireless network projects, a complete site preparation list is provided for your internal staff to prepare the site for deployment. For increased efficiency, Lanlinx can pre-configure APs, controllers, security applications, and management applications with the profiles as defined by the design before mounting and power-up on-site. Once installed, WLAN cell coverage is verified against the design and any exceptions are noted. AP configurations may be changed, if required at that time. Final sign-off is performed only after the client reviews the WLAN coverage and operation is as promised.

For outdoor wireless network projects, a site preparation list is provided before the Lanlinx installation crew arrives so the customers internal staff can prepare the site from deployment. This may include provisioning power or rackspace to a site or obtaining building permits. Installation of antenna and radio mounting hardware follows along with mounting of antennas, transmission lines, power, grounding, and lightning protection. Once installed, the WWAN signals are peaked and verified against the design and any exceptions are noted. Radio units are configured with site specific profiles and throughput tests are performed. Final sign-off is executed only after the client reviews the WWAN operation is as promised.

 

 


Rian Rathwick
Written on Friday, 01 December 2006 07:57 by Rian Rathwick

Viewed 3844 times so far.
Like this? Tweet it to your followers!